The proposed modernisation program aimed to open the school to the students during and after school hours with the introduction of new facilities such as a covered sports field and a multipurpose hall. The proposed addition linked the city street to the school’s campus ground with a volumetric pavilion that was conceptualised as both a formal and functional solution in response to the context of the site. In fact, this new volume has two programs with the most public access – a multipurpose hall, and covered sports field.